|
Floor Plan
|
Shanghai Mart
Intex Shanghai Hall
1 |
Intex Shanghai Hall
2 |
Location
Map |
Hall
Database |
|
Expo &
Conference — Expo
Facilities |
| Tech
Specification |
| Facilities |
Level 1
|
Level 2
|
Access (Exhibits
to hall) |
Via 4 steel roll-up
doors North 2:(4.8m wide 4.0m high) South
2:(4.8m wide3.8m high) |
|
Via 2 freight lifts Via freight Balcony:
(7.9mW 14.7mL) With I steel roll-up door
(4.8m W 4.0mH)
| |
| Exhibits to Site |
Auto, Forklift, etc |
Hydraulic lift |
| Flooring |
Concrete Trowel |
Concrete Trowel
|
| Floor Loading |
2,000kg/sq.m |
1,000kg/sq.m |
| Ceiling Height |
7.9m |
4.2m |
| Escalators |
From Level 1 to Level 2 ----2 units |
From Level 2 to Level 1 ----2 units
|
| Lifts |
Goods Lift: 2 units
1#- Rated Capacity: 3,000kg Cab dimension:
3.5mL3.4mW2.1mH Door opening: 2.3Mh2.5mW
2#- Rated Capacity: 1,000kg Cab dimension:
2.2mL1.9mW2.2mH Door opening: 2.1mH1.5mW |
See left column
|
| Power Supply |
4 wire, 3 phase 380V Single phase 220V
50 HZ/ 2000KVA |
See left column |
| Air-compressor |
6-8BAR |
6-8BAR |
| Lighting Level |
200LX(Average) |
See left column |
| Water Supply |
41 outlets, 15mm
each 2 outlets, 50mm each |
9 outlets, 15mm each
|
| Floor Drains |
41 offtakes, 100mm each |
9 offtakes, 100mm each |
| Fire Protection |
Automatic Spraying System Fire Detection
& Alarm System Fire Hydrant Portable
Fire Extinguishers |
See left column
|
| Air-Conditioning |
27 ℃ in summer, 18 ℃ in Winter |
See left column |
| Ventilation |
7200m 3 /hour |
Use windows |
| Telephone |
200 extensions, IDD, DDD, IC card.
Electric card and local lines are available
|
See left column |
| Security System |
24 hours security
guards on duty |
See left column
|
| P.A. System |
Available at exhibition hall and
organizer's office |
See left column |
| Emergency Lighting
|
Available at
exhibition hall and organizer's office |
See left column
|
| Offices |
Available at Level 2 |
2 office rooms for organizer, 3
meeting rooms, 1 customs office |
| Toilet |
3 for Man & 3
for Lady |
3 for Man & 3
for Lady |
| ITEM |
EXHIBITION HALL 1/F |
EXHIBITION HALL 3/F |
EXHIBITION HALL
4/F |
| Freight
Entrance (Exhibits Entering Hall) |
Four Rolling
Doors (W′H):West : 3m′2.37mEast :
5.33m′4.32mNorthwest : 5.17m′4.42mNortheast :
5.2m′4.7m |
Five Freight
Lifts(East 3 West
2):2.35m(W)′2.5m(H)′3.35(D)Freight Loading:5
tonFreight Door Size:1.8m′2.4m |
| Exhibition Hall Area |
6200SQM |
5400SQM East3800SQM;
West1600SQM) |
8200SQM |
| Exhibits Transported to
Booth |
Forklift, Hydraulic
Cart(1.5ton),Handcart(1ton)and so on |
Hydraulic cart,
Handcart |
| Exhibition Hall
Flooring |
Anti-skid Flooring |
Concrete Trowel
Flooring |
| Floor Loading |
1500kg/SQM |
500kg/SQM |
1000kg/SQM |
| Ceiling Height/Minimum |
8m/5.4m |
3.8m/2.7m |
6m/4.3m |
| Pillar Size |
Various Sizes
(Please See the Attached Pictures) |
| Escalator |
Four per
Floor(1F----4F), Two up and Two Down, 1.2m(W),
9000person/hr, 0.5m/s |
| Power Supply 380V 3
phases |
1840KW |
1000KW |
1480KW |
| Compressed--Air |
7kg/cm2,total amount
3m3/min |
/ |
/ |
| Water Supply |
17 Outlets, DN20, 5.5kg |
/ |
13 Outlets,DN20,
3.5kg |
| Drainage |
19 Offtakes,100mm
Diameter |
/ |
13 Offtakes,50mm Diameter
|
| Fire Control |
Auto-shower
System, Smoke-Alarming System, Fire Hydrant, Fire
Extinguisher |
| Air-condition |
Summer 25°C,
Winter18°C |
| Fresh Air |
41000CBM/HR |
36000CBM/HR |
54000CBM/HR |
| Telephone |
International
and Domestic Available |
| Internet |
ISDN 、ADSL、 WLAN
|
| Security |
24 Hours
Safe-security Service |
| Broadcasting |
Information
Desk, North Lobby, 1F |
| Emergency Lighting |
Lobby and
Exhibition Hall |
| Tea Service |
2 Places |
3 Places |
3 Places |
| Male/Female Toilet |
2 Places |
3 Places |
3 Places |
| Business Center |
North Lobby,
1F |
Venue
Picture |
Guide For
Parking |
Shanghai Mart Hall
4 |
|